Done.
Something went wrong. Please try again.

BS Battery, Kuřim – BESS
BESS 3,000 kW / 6,709 kWh
Tesla Energy Group
Utility
BESS output: 3,000 kW
BESS capacity: 6,709 kWh
BESS capacity: 6,709 kWh
BESS for ancillary services · 2025 – 2026

MG Power, Velká Bíteš – BESS
BESS 10,000 kW / 26,820 kWh
Tesla Energy Group
Utility
BESS power: 10,000 kW
BESS capacity: 26,820 kWh
BESS capacity: 26,820 kWh
Wind energy · 2025

HMC, Vlkanová – BESS
BESS 3,780 kW / 5,590 kWh
Tesla Energy Group
Utility
BESS power: 3,780 kW
BESS capacity: 5,590 kWh
BESS capacity: 5,590 kWh
Industrial park, indoor installation · 2022 – 2023

Asekol, Jihlava – BESS
BESS 200 kW / 466 kWh
Tesla Energy Group
Utility
BESS power: 200 kW
BESS capacity: 466 kWh
BESS capacity: 466 kWh
PV cooperation · 2024

Novamina, Zagreb – BESS
BESS 2× 1,500 kW / 4,472 kWh
Tesla Energy Group
Utility
BESS power: 2× 1,500 kW
BESS capacity: 4,472 kWh
BESS capacity: 4,472 kWh
Innovation and Technology Center · 2023

Stredoslovenská energetika, P. Dravce – BESS
BESS 1,250 kW / 1,389 kWh
Tesla Energy Group
Utility
BESS power: 1,250 kW
BESS capacity: 1,389 kWh
BESS capacity: 1,389 kWh
Gas turbine · 2023 – 2024

Veolia, Levice – BESS
BESS 5,200 kW / 2,914 kWh
Tesla Energy Group
Utility
BESS power: 5,200 kW
BESS capacity: 2,914 kWh
BESS capacity: 2,914 kWh
Gas turbine · 2022 – 2023

UCED, Kutná Hora – BESS
BESS 4,000 kW / 4,477 kWh
Tesla Energy Group
Utility
BESS power: 4,000 kW
BESS capacity: 4,477 kWh
BESS capacity: 4,477 kWh
Industrial park, biomass · 2025

MECOM, Lučenec – BESS
BESS 340 kW / 640 kWh
Tesla Energy Group
Heating industry
BESS power: 340 kW
BESS capacity: 640 kWh
BESS capacity: 640 kWh
Cogeneration plant · 2021 – 2022

STEFE, Zvolen – BESS
BESS 550 kW / 1,118 kWh
Tesla Energy Group
Heating industry
BESS power: 550 kW
BESS capacity: 1,118 kWh
BESS capacity: 1,118 kWh
Thermal infrastructure · 2023

ENSTRA, Okoličné – BESS
BESS 550 kW / 1,118 kWh
Tesla Energy Group
Renewable energy
BESS power: 550 kW
BESS capacity: 1,118 kWh
BESS capacity: 1,118 kWh
Hydroelectric power plant · 2021 – 2022

Infinity Group, Vígľaš – BESS
BESS 100 kW / 186 kWh
Tesla Energy Group
Renewable energy
BESS power: 100 kW
BESS capacity: 186 kWh
BESS capacity: 186 kWh
Industrial park, PV plant · 2023

KKS Hungary, Hungary – BESS
BESS 8× 499 kW / 1,677 kWh
Tesla Energy Group
Renewable energy
BESS power: 8× 499 kW
BESS capacity: 1,677 kWh
BESS capacity: 1,677 kWh
PV system integration · 2024 – 2025

Žipotín – BESS
BESS 3× 1,000 kW / 3× 2,236 kWh
Tesla Energy Group
Renewable energy
BESS output: 3× 1,000 kW
BESS capacity: 3× 2,236 kWh
BESS capacity: 3× 2,236 kWh
Wind power plant · 2025

Stack ASSETS, Česká Lípa – BESS
BESS 2× 1,500 kW / 4,472 kWh
Tesla Energy Group
Industry
BESS power: 2× 1,500 kW
BESS capacity: 4,472 kWh
BESS capacity: 4,472 kWh
PV system integration · 2023

Dalu Toyota, Lovosice – BESS
BESS 1,000 kW / 1,304 kWh
Tesla Energy Group
Industry
BESS output: 1,000 kW
BESS capacity: 1,304 kWh
BESS capacity: 1,304 kWh
Manufacturing plant · 2024

Breno, Postřižín – BESS
BESS 300 kW / 372 kWh
Tesla Energy Group
Industry
BESS output: 300 kW
BESS capacity: 372 kWh
BESS capacity: 372 kWh
Logistics center · 2024 – 2025

Trafinoil, Horní Suchá – BESS
BESS 200 kW / 466 kWh
Tesla Energy Group
Industry
BESS power: 200 kW
BESS capacity: 466 kWh
BESS capacity: 466 kWh
Logistics center · 2025

TESLA Liptovský Hrádok – PV + BESS
PV 500 kWp · BESS 400 kW / 932 kWh
ENSTRA Group
PV + BESS
PV system output: 500 kWp
BESS output: 400 kW
BESS capacity: 932 kWh
BESS output: 400 kW
BESS capacity: 932 kWh
Photovoltaic power plant with battery storage for a production facility

Nová Karolína – PV
PV 1,000 kWp
ENSTRA Group
PV
PV system output: 1,000 kWp
Rooftop photovoltaic power plant on a shopping center

Okoličné hydroelectric power plant – BESS
BESS 550 kW / 1,118 kWh
ENSTRA Group
Hydroelectric power plant
BESS output: 550 kW
BESS capacity: 1,118 kWh
BESS capacity: 1,118 kWh
Small hydroelectric power plant supplemented with battery storage

SPS Strečno – PV + BESS
PV 200 kWp · BESS 200 kW / 466 kWh
ENSTRA Group
PV + BESS
PV output: 200 kWp
BESS output: 200 kW
BESS capacity: 466 kWh
BESS output: 200 kW
BESS capacity: 466 kWh
Photovoltaic power plant with battery storage

Selected – BESS + CHP thermal management
CHP 800 kW · BESS 550 kW / 1,118 kWh
ENSTRA Group
Heating industry
CHP output: 800 kW
BESS output: 550 kW
BESS capacity: 1,118 kWh
BESS output: 550 kW
BESS capacity: 1,118 kWh
Cogeneration unit with battery storage for heating systems

Malacky Logistics Center – PV + BESS
PV 330 kWp · BESS 300 kW / 699 kWh
ENSTRA Group
PV + BESS
PV system output: 330 kWp
BESS output: 300 kW
BESS capacity: 699 kWh
BESS output: 300 kW
BESS capacity: 699 kWh
Photovoltaic power plant with battery storage for a logistics center

Kružlov industrial hall – PV + BESS
PV system 500 kWp · BESS 300 kW / 699 kWh
ENSTRA Group
PV + BESS
PV system output: 500 kWp
BESS output: 300 kW
BESS capacity: 699 kWh
BESS output: 300 kW
BESS capacity: 699 kWh
Photovoltaic power plant with battery storage for an industrial hall

MECOM GROUP, Lučenec
CHP 2,500 kW · BESS 340 kW / 688 kWh
ENSTRA Group
Energy management
CHP unit output: 2,500 kW
BESS output: 340 kW
BESS capacity: 688 kWh
BESS output: 340 kW
BESS capacity: 688 kWh
Cogeneration, battery storage, and energy management for a manufacturing plant

Veľké Leváre PV system
20 kWp PV system
ENSTRA Group
PV
PV system output: 20 kWp
Photovoltaic power plant

Agro Mútne – PV system
120 kWp PV system
ENSTRA Group
PV
PV output: 120 kWp
Rooftop photovoltaic power plant for an agricultural business

Ilava – PV + BESS
PV 100 kW · BESS 100 kW / 233 kWh
ENSTRA Group
PV + BESS
PV output: 100 kW
BESS output: 100 kW
BESS capacity: 233 kWh
BESS output: 100 kW
BESS capacity: 233 kWh
Photovoltaic power plant with battery storage

Dubnica nad Váhom – PV + BESS
PV 250 kW · BESS 300 kW / 699 kWh
ENSTRA Group
PV + BESS
PV output: 250 kW
BESS output: 300 kW
BESS capacity: 699 kWh
BESS output: 300 kW
BESS capacity: 699 kWh
Photovoltaic power plant with battery storage

LDS Evergreen Tále
Local distribution system
ENSTRA Group
Local distribution system
Operation of a local distribution system
Tále Resort

LDS Industry Park, Banská Bystrica
Local distribution system
ENSTRA Group
Local distribution system
Operation of a local distribution system
Banská Bystrica industrial park

LDS LIDL, Zvolen
Local distribution system
ENSTRA Group
Local distribution system
Operation of a local distribution system
Zvolen commercial zone

LDS Budča
Local distribution system
ENSTRA Group
Local distribution system
Operation of a local distribution system
Budča

Dlážděná boiler room
300 kW gas boiler room
ENSTRA Group
Heating industry
Output: 300 kW
Gas boiler room

Hloubětín boiler room
100 kW gas boiler room
ENSTRA Group
Heating industry
Output: 100 kW
Gas boiler room

Vily Třebešín boiler rooms
5 gas boiler rooms of 70 kW each
ENSTRA Group
Heating industry
Output: 5× 70 kW
Five gas boiler rooms

Palouk heat exchanger stations
2 heat exchanger stations of 560 kW each
ENSTRA Group
Heating industry
Output: 2× 560 kW
Two heat exchanger stations

Zahálka boiler room
500 kW gas boiler room + 100 kW electric boiler
ENSTRA Group
Heating industry
Output: 500 kW + 100 kW
Gas boiler room supplemented by a 100 kW electric boiler

Bleriot A, B, C
3 heat exchanger stations of 230 kW each
ENSTRA Group
Heating industry
Output: 3× 230 kW
Three heat exchanger stations

Opuštěná heat pump
Heat pump – heating and cooling
ENSTRA Group
Heating industry
Mode: heating and cooling
Heat pump operation

Melantrich boiler room
1,000 kW gas boiler room
ENSTRA Group
Heating industry
Power: 1,000 kW
Gas boiler room

Jarov heat exchanger station
800 kW heat exchanger station
ENSTRA Group
Heating industry
Output: 800 kW
Heat exchanger station

Sakura boiler room
500 kW gas boiler room
ENSTRA Group
Heating industry
Output: 500 kW
Gas boiler room

Output: Vanguard boiler room
Output: Gas boiler room 1,600 kW
ENSTRA Group
Heating industry
Output: 1,600 kW
Gas boiler room

CITY TOWER heat exchanger station
Heat exchanger station 4,000 kW
ENSTRA Group
Heating industry
Output: 4,000 kW
Heat exchanger station

Liptovský Hrádok boiler room
Central boiler room 5.5 MW
ENSTRA Group
Heating industry
Output: 5.5 MW
Central boiler room

Trstená Západ boiler room
Central boiler room 6.5 MW
ENSTRA Group
Heating industry
Output: 6.5 MW
Central boiler room

Albatros boiler room
Gas boiler room 500 kW
ENSTRA Group
Heating industry
Output: 500 kW
Gas boiler room

T-Mobile Roztyly heat exchanger station
Heat exchanger station 2,300 kW
ENSTRA Group
Heating industry
Output: 2,300 kW
Heat exchanger station installation